As part of Australia’s 2022 FIFA World Cup bid in 2010, an analysis of Townsville’s existing Willows Sports Complex suggested a total redevelopment of the site. Construction of the stadium, carried out by BESIX Watpac, began on 18 August 2017, and was completed in February 2020.
The project won three awards at the 2020 Master Builders Queensland construction awards for North Queensland: Project of the Year award, Best Sporting Facilities award and Excellence in Workplace Health & Safety.
NORTH QUEENSLAND STADIUM
X100 Green Cure was used throughout this epic undertaking. X100 Green Cure is a non-membrane forming silicate proprietary solution that provides an exceptional cure regime equal to water pond curing, which is easily applied at time of pour.
Features and Benefits:
- Will cure concrete equal to water pond curing.
- Virtually eliminates plastic cracking.
- Low cost cure regime.
- Hardens surface and reduces dusts.
- Reduces shrinkage.
- Retards efflorescence.
- Can be used on vertical or horizontal substrates
- Zero VOC, environmentally friendly, user safe.
- Compatible with most flooring and coating systems.
- After trade friendly.
- Indefinite shelf life.
- Minimum site disruption, trafficable after 2 hours